General Engineering Documents
The following list of Engineering Documents are listed as the General category.
- SLWG-01 Typical Valve Box and Collar (PDF)(PDF, 103KB)
- SLWG-01 Typical Valve Box and Collar (RTF)(RTF, 1MB)
- SLWG-02 Valve Location Guidelines for Intersections (PDF)(PDF, 62KB)
- SLWG-02 Valve Location Guidelines for Intersections (RTF)(RTF, 1MB)
- SLWG-03 Wet Tap Assembly (PDF)(PDF, 72KB)
- SLWG-03 Wet Tap Assembly (RTF)(RTF, 762KB)
- SLWG-04 Standard Separation Requirements (PDF)(PDF, 155KB)
- SLWG-04 Standard Separation Requirements (RTF)(RTF, 970KB)
- SLWG-05 Pipeline Restraint Requirements (Horizontal) (PDF)(PDF, 100KB)
- SLWG-05 Pipeline Restraint Requirements (Horizontal) (RTF)(RTF, 1MB)
- SLWG-06 Pipeline Restraint Requirements (Vertical) (PDF)(RTF, 1MB)
- SLWG-06 Pipeline Restraint Requirements (Vertical) (RTF)(RTF, 1MB)
- SLWG-07 Pipeline Restraint Requirements (Reducer) (PDF)(PDF, 95KB)
- SLWG-07 Pipeline Restraint Requirements (Reducer) (RTF)(RTF, 965KB)
- SLWG-08 Standard Pipe Trench Cross Section (PDF)(PDF, 97KB)
- SLWG-09 Utility Road Cut Pavement Restoration (PDF)(PDF, 107KB)
- SLWG-09 Utility Road Cut Pavement Restoration (RTF)(RTF, 1MB)
- SLWG-10 Pipe Casing for Jack and Bore (PDF)(PDF, 98KB)
- SLWG-10 Pipe Casing for Jack and Bore (RTF)(RTF, 1MB)
- SLWG-11A Aerial Crossing Detail (PDF)(PDF, 121KB)
- SLWG-11A Aerial Crossing Detail (RTF)(RTF, 1MB)
- SLWG-11B Fan Guard - Pile Cap Detail (PDF)(PDF, 98KB)
- SLWG-11B Fan Guard - Pile Cap Detail (RTF)(RTF, 1MB)
- SLWG-12A Canal or Drainage Ditch Crossing (PDF)(PDF, 71KB)
- SLWG-12A Canal or Drainage Ditch Crossing (RTF)(RTF, 680KB)
- SLWG-12 B Canal Crossing Sign (PDF)(PDF, 154KB)
- SLWG-12 B Canal Crossing Sign (RTF)(RTF, 528KB)
- SLWG-13A Potable Temporary Jumper Connection (PDF)(PDF, 97KB)
- SLWG-13A Potable Temporary Jumper Connection (RTF)(RTF, 832KB)
- SLWG-13B Temporary Jumper Connection (PDF)(PDF, 198KB)
- SLWG-13B Temporary Jumper Connection (RTF)(RTF, 2MB)
- SLWG-14A Non-potable Water Temporary Jumper Connection (PDF)(PDF, 114KB)
- SLWG-14A Non-potable Water Temporary Jumper Connection (RTF)(RTF, 1002KB)
- SLWG-14B Non-potable Water Temporary Jumper Connection (PDF)(PDF, 106KB)
- SLWG-14B Non-potable Water Temporary Jumper Connection (RTF)(RTF, 1MB)
- SLWG-15 Reclaimed Water Site Signage (PDF)(PDF, 217KB)
- SLWG-15 Reclaimed Water Site Signage (RTF)(RTF, 691KB)
- SLWG-16 A Chain Link Fence (PDF)(PDF, 97KB)
- SLWG-16 A Chain Link Fence (RTF)(RTF, 1MB)
- SLWG-16B Fence Details (PDF)(PDF, 100KB)
- SLWG-16B Fence Details (RTF)(RTF, 1MB)
- SLWG-17 Bollard Detail (PDF)(PDF, 69KB)
- SLWG-17 Bollard Detail (RTF)(RTF, 1020KB)
- SLWG-18 Qualified Products List (PDF)(PDF, 8MB)